Assessment Year | 2016 |
---|---|
Principal Product | Stainless Steel Pipe |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
200,000
ft2
|
Annual Production | 6,000
ton
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $270,644 | 4,786,200 |
kWh
|
$0.057 |
Electricity Demand | $207,107 | 19,374 |
kW-mo/yr
|
$10.69 |
Electricity Fees | $48,517 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $98,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $59,343 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $23,090 | $560 | - |
$23,090
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $17,090 | $208 |
$17,090
299,829
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,550 | $40 |
$12,123
212,688
kWh
|
$2,427
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,501 | $21,680 |
$8,637
151,525
kWh
|
$4,864
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,548 | $1,660 |
$10,791
189,308
kWh
|
$757
-
kW-mo/yr
|
- | |
06 | 2.7425: Clean or color roof to reduce solar load | $9,937 | $4,464 |
$6,359
111,566
kWh
|
$3,578
-
kW-mo/yr
|
- | |
07 | 2.4239: Eliminate or reduce compressed air usage | $3,576 | $2,520 |
$2,293
40,227
kWh
|
$1,283
-
kW-mo/yr
|
- | |
08 | 2.7134: Use photocell controls | $1,616 | $2,240 |
$1,616
28,355
kWh
|
- | - | |
09 | 3.4151: Minimize water usage | $970 | $2,200 | - | - |
$970
-
Tgal
|
|
10 | 2.7221: Lower temperature during the winter season and vice-versa | $926 | $40 |
$926
16,235
kWh
|
- | - | |
11 | 2.7111: Reduce illumination to minimum necessary levels | $746 | $440 |
$393
6,902
kWh
|
$353
-
kW-mo/yr
|
- | |
12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $544 | $2,357 |
$202
3,542
kWh
|
$342
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $98,094 | $38,409 |
$60,430
1,060,177
kWh
|
$36,694
-
kW-mo/yr
|
$970
-
Tgal
|
||
TOTAL IMPLEMENTED | $59,343 | $11,572 |
$49,975
876,755
kWh
|
$8,398
-
kW-mo/yr
|
$970
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs