Assessment Year | 2021 |
---|---|
Principal Product | Pressure Regulators |
NAICS | 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial |
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $50 M to 100M |
# of Employees | 124 |
Plant Area |
215,219
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $252,037 | 6,200,627 |
kWh
|
$0.041 |
Electricity Demand | $317,692 | 19,565 |
kW-mo/yr
|
$16.24 |
Electricity Fees | $2,257 | - |
|
- |
Natural Gas | $40,354 | 21,042 |
MMBtu
|
$1.92 |
TOTAL YEARLY COSTS | $612,340 | |||
RECOMMENDED SAVINGS* | $82,868 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,687 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,454 | $75,747 |
$14,796
364,438
kWh
|
$13,658
-
kW-mo/yr
|
- | - | |
02 | 2.7135: Install occupancy sensors | $20,602 | $23,284 |
$10,078
248,225
kWh
|
$10,524
-
kW-mo/yr
|
- | - | |
03 | 2.2511: Insulate bare equipment | $18,040 | $7,122 |
$8,148
200,682
kWh
|
$7,519
-
kW-mo/yr
|
$2,373
-
MMBtu
|
- | |
04 | 2.4157: Establish a predictive maintenance program | $4,330 | $1,500 |
$3,127
77,012
kWh
|
$2,891
-
kW-mo/yr
|
- | $(-1,688.0) | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,431 | $403 |
$2,213
54,502
kWh
|
$1,218
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,500 | $1,792 |
$1,298
31,980
kWh
|
$1,202
-
kW-mo/yr
|
- | - | |
07 | 2.4151: Develop a repair/replace policy | $1,749 | $672 |
$1,489
36,663
kWh
|
$1,380
-
kW-mo/yr
|
- | $(-1,120.0) | |
08 | 2.4224: Upgrade controls on compressors | $1,727 | $6,630 |
$1,137
27,993
kWh
|
$590
-
kW-mo/yr
|
- | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,302 | $4,100 | - | - |
$1,407
-
MMBtu
|
$(-105.0) | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $733 | $35 |
$473
11,641
kWh
|
$260
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $82,868 | $121,285 |
$42,759
1,053,136
kWh
|
$39,242
-
kW-mo/yr
|
$3,780
-
MMBtu
|
$(-2,913.0) | ||
TOTAL IMPLEMENTED | $52,687 | $38,908 |
$26,826
660,705
kWh
|
$24,994
-
kW-mo/yr
|
$3,780
-
MMBtu
|
$(-2,913.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs