Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gypsum products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0597 #02 Y:2012 Use or replace with energy efficient substitutes $41,834 $41,834
OR0597 #01 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $8,480 $9,480
UA0014 #11 Y:2007 Install timers and/or thermostats $1,430 $952
UA0014 #10 Y:2007 Utilize energy-efficient belts and other improved mechanisms $644 $700
UA0014 #09 Y:2007 Install occupancy sensors $2,288 $770
UA0014 #08 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,943 $1,164
UA0014 #07 Y:2007 Shut off pilots in standby equipment $457 $72
UA0014 #06 Y:2007 Utilize higher efficiency lamps and/or ballasts $3,934 $13,520
UA0014 #05 Y:2007 Install timers and/or thermostats $1,454 $591
UA0014 #04 Y:2007 Optimize plant power factor $5,800 $14,850
UA0014 #03 Y:2007 Recover waste heat from equipment $2,493 $2,877
UA0014 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $8,143 $1,040
UA0014 #01 Y:2007 Reduce the pressure of compressed air to the minimum required $1,796 -
CO0604 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $31,080 $68,340
CO0604 #04 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $14,820 $310
CO0604 #03 Y:2007 Eliminate or reduce compressed air usage $27,400 $2,500
CO0604 #02 Y:2007 Direct warmest air to combustion intake $112,000 $18,430
CO0604 #01 Y:2007 Improve combustion control capability $140,220 $500,000
CO0603 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,160 $90
CO0603 #03 Y:2007 Utilize higher efficiency lamps and/or ballasts $31,750 $71,440