ITAC Assessment: UA0014
ITAC logo
ITAC Assessment: UA0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Insulation
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 19
Plant Area 32,000
ft2
Annual Production 1,200,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,696 1,561,440
kWh
Electricity Demand $27,824 5,870
kW-mo/yr
Natural Gas $26,211 1,678
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,796 - $1,796
21,457
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,143 $1,040 $8,143
92,290
kWh
- -
03 2.2437: Recover waste heat from equipment $2,493 $2,877 - - $2,493
-
MMBtu
04 2.3212: Optimize plant power factor $5,800 $14,850 - $5,800
-
kW-mo/yr
-
05 2.7261: Install timers and/or thermostats $1,454 $591 $1,454
41,039
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,934 $13,520 $3,229
37,089
kWh
$705
-
kW-mo/yr
-
07 2.6214: Shut off pilots in standby equipment $457 $72 - - $457
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,943 $1,164 $2,943
35,128
kWh
- -
09 2.7135: Install occupancy sensors $2,288 $770 $2,288
26,283
kWh
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $644 $700 $531
6,105
kWh
$113
-
kW-mo/yr
-
11 2.7261: Install timers and/or thermostats $1,430 $952 - - $1,430
-
MMBtu
TOTAL RECOMMENDED $31,382 $36,536 $20,384
259,391
kWh
$6,618
-
kW-mo/yr
$4,380
-
MMBtu
TOTAL IMPLEMENTED $13,280 $2,655 $11,393
154,786
kWh
- $1,887
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs