ITAC Assessment: LL0118
ITAC logo
ITAC Assessment: LL0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Valves
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $50
M
to 100
M
# of Employees 418
Plant Area 303,000
ft2
Annual Production 410,729
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,319 12,134,270
kWh
Electricity Demand $233,009 28,788
kW-mo/yr
Electricity Fees $23,434 -
Natural Gas $170,928 35,367
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,499

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $53,505 $55,889 - $51,447
-
kW-mo/yr
$2,058
02 2.7135: Install occupancy sensors $10,056 $297 $8,890
2,000,590
kWh
$779
-
kW-mo/yr
$387
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,379 $2,190 $4,211
95,018
kWh
- $168
04 2.3137: Use power during off-peak periods $18,618 - - $17,902
-
kW-mo/yr
$716
05 2.7111: Reduce illumination to minimum necessary levels $36,180 - $23,395
527,868
kWh
$11,393
-
kW-mo/yr
$1,392
06 2.7224: Reduce space conditioning during non-working hours $15,884 $456 $15,273
344,613
kWh
- $611
TOTAL RECOMMENDED $138,622 $58,832 $51,769
2,968,089
kWh
$81,521
-
kW-mo/yr
$5,332
TOTAL IMPLEMENTED $66,499 $2,943 $51,769
2,968,089
kWh
$12,172
-
kW-mo/yr
$2,558
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs