ITAC Assessment: CO0603
ITAC logo
ITAC Assessment: CO0603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Gypsum Wall Paneling
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $50
M
to 100
M
# of Employees 65
Plant Area 110,000
ft2
Annual Production 312,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $581,487 13,260,000
kWh
Natural Gas $6,089,933 664,001
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,151,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2424: Use heat in flue gases to preheat products or materials $996,440 $366,170 $(-37,740.0)
(-851,200)
kWh
$(-20,310.0)
-
kW-mo/yr
$1,054,490
-
MMBtu
- -
02 2.1116: Improve combustion control capability $121,430 $100,000 - - $121,430
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $31,750 $71,440 $22,250
501,800
kWh
$9,070
-
kW-mo/yr
- $700 $(-270.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,160 $90 $1,360
30,800
kWh
$450
-
kW-mo/yr
- $150 $200
TOTAL RECOMMENDED $1,151,780 $537,700 $(-14,130.0)
(-318,600)
kWh
$(-10,790.0)
-
kW-mo/yr
$1,175,920
-
MMBtu
$850 $(-70.0)
TOTAL IMPLEMENTED $31,750 $71,440 $22,250
501,800
kWh
$9,070
-
kW-mo/yr
- $700 $(-270.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs