Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

270

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0239 #05 Y:2020 Install timers and/or thermostats $5,210 $40
TT0239 #04 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $10,958 $1,500
TT0239 #03 Y:2020 Recover waste heat from equipment $11,285 $11,400
TT0239 #02 Y:2020 Utilize higher efficiency lamps and/or ballasts $19,993 $173,628
TT0239 #01 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $21,455 $1,630
AM0765 #06 Y:2018 Install occupancy sensors $510 $595
AM0765 #05 Y:2018 Apply for tax-free status for energy purchases $2,740 -
AM0765 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $7,210 $22
AM0765 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $9,060 $1,000
AM0765 #02 Y:2018 Optimize plant power factor $71,530 $81,610
AM0765 #01 Y:2018 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $173,300 $721,800
DL0155 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,405 $13,615
DL0155 #04 Y:2015 Shade windows from summer sun $1,760 $6,840
DL0155 #03 Y:2015 Turn off equipment during breaks, reduce operating time $8,960 $6,880
DL0155 #02 Y:2015 Turn off equipment during breaks, reduce operating time $500 -
DL0155 #01 Y:2015 Turn off equipment during breaks, reduce operating time $3,690 -
SD0513 #06 Y:2015 Utilize energy-efficient belts and other improved mechanisms $356 $72
SD0513 #05 Y:2015 Install occupancy sensors $505 $350
SD0513 #04 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,240 $2,500
SD0513 #03 Y:2015 Reduce temperature of process equipment when on standby $1,873 $200