| Assessment Year | 2020 |
|---|---|
| Principal Product | oven door glass, refrigerator shelving |
| NAICS | 327211: Flat Glass Manufacturing |
| SIC | 3211: Flat Glass |
| Sales Range | $10 M to 50M |
| # of Employees | 267 |
| Plant Area |
244,000
ft2
|
| Annual Production | 2,250,000
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,236,125 | 28,992,480 |
kWh
|
$0.043 | |
| Electricity Demand | $848,076 | 143,721 |
kW-mo/yr
|
$5.90 | |
| Natural Gas | $415,655 | 52,401 |
MMBtu
|
$7.93 | |
| Waste Disposal Costs | |||||
| Water Usage | $140,376 | 27,143 |
Tgal
|
$5.17 | |
| Water Disposal | $151,013 | 27,143 |
Tgal
|
$5.56 | |
| TOTAL YEARLY COSTS | $2,791,245 | ||||
| RECOMMENDED SAVINGS* | $77,731 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $59,019 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,455 | $1,630 |
$21,455
503,647
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,993 | $173,628 |
$15,644
367,252
kWh
|
$4,349
-
kW-mo/yr
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $11,285 | $11,400 | - | - |
$11,285
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,958 | $1,500 |
$9,210
216,197
kWh
|
$1,748
-
kW-mo/yr
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $5,210 | $40 | - | - |
$5,210
-
MMBtu
|
|
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,142 | $40 |
$4,142
97,236
kWh
|
- | - | |
| 07 | 2.7261: Install timers and/or thermostats | $2,471 | $2,000 |
$2,430
57,035
kWh
|
- |
$41
-
MMBtu
|
|
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,217 | $1,350 |
$1,736
40,740
kWh
|
$481
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $77,731 | $191,588 |
$54,617
1,282,107
kWh
|
$6,578
-
kW-mo/yr
|
$16,536
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $59,019 | $178,798 |
$52,881
1,241,367
kWh
|
$6,097
-
kW-mo/yr
|
$41
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs