ITAC Assessment: MI0256
ITAC logo
ITAC Assessment: MI0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Pharmacutical
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 50,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,744
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,693 4,863,600
kWh
Electricity Demand $110,630 8,153
kW-mo/yr
Electricity Fees $45,000 -
Natural Gas $78,473 12,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,495

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,834 $20,160 $16,628
386,703
kWh
$7,206
-
kW-mo/yr
-
02 2.7425: Clean or color roof to reduce solar load $23,626 $13,599 $16,495
383,601
kWh
$7,131
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $23,619 $80 $16,495
383,601
kWh
$7,124
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,420 $1,660 $8,698
202,273
kWh
$5,722
-
kW-mo/yr
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $11,196 $3,960 - - $11,196
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $7,634 $80 $3,571
83,057
kWh
$4,063
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,540 $3,240 $2,468
57,346
kWh
$1,072
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,517 $3,360 $811
18,870
kWh
$706
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,183 $6,800 $586
13,628
kWh
$597
-
kW-mo/yr
-
TOTAL RECOMMENDED $110,569 $52,939 $65,752
1,529,079
kWh
$33,621
-
kW-mo/yr
$11,196
-
MMBtu
TOTAL IMPLEMENTED $80,495 $19,379 $45,259
1,052,532
kWh
$24,040
-
kW-mo/yr
$11,196
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs