Assessment Year | 2014 |
---|---|
Principal Product | Pharmacutical |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
50,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $207,693 | 4,863,600 |
kWh
|
$0.043 |
Electricity Demand | $110,630 | 8,153 |
kW-mo/yr
|
$13.57 |
Electricity Fees | $45,000 | - |
|
- |
Natural Gas | $78,473 | 12,016 |
MMBtu
|
$6.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $110,569 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $80,495 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,834 | $20,160 |
$16,628
386,703
kWh
|
$7,206
-
kW-mo/yr
|
- | |
02 | 2.7425: Clean or color roof to reduce solar load | $23,626 | $13,599 |
$16,495
383,601
kWh
|
$7,131
-
kW-mo/yr
|
- | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $23,619 | $80 |
$16,495
383,601
kWh
|
$7,124
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,420 | $1,660 |
$8,698
202,273
kWh
|
$5,722
-
kW-mo/yr
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $11,196 | $3,960 | - | - |
$11,196
-
MMBtu
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,634 | $80 |
$3,571
83,057
kWh
|
$4,063
-
kW-mo/yr
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,540 | $3,240 |
$2,468
57,346
kWh
|
$1,072
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,517 | $3,360 |
$811
18,870
kWh
|
$706
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,183 | $6,800 |
$586
13,628
kWh
|
$597
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $110,569 | $52,939 |
$65,752
1,529,079
kWh
|
$33,621
-
kW-mo/yr
|
$11,196
-
MMBtu
|
||
TOTAL IMPLEMENTED | $80,495 | $19,379 |
$45,259
1,052,532
kWh
|
$24,040
-
kW-mo/yr
|
$11,196
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs