ITAC Assessment: SD0513
ITAC logo
ITAC Assessment: SD0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Optical Glass
NAICS 327211: Flat Glass Manufacturing
SIC 3211: Flat Glass
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 150,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,240 2,593,421
kWh
Electricity Demand $67,590 4,608
kW-mo/yr
Electricity Fees $11,411 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $10,628 $42,560 $3,679
82,149
kWh
$6,949
-
kW-mo/yr
02 2.2514: Cover open tanks $4,719 $415 $3,531
78,820
kWh
$1,188
-
kW-mo/yr
03 2.6241: Reduce temperature of process equipment when on standby $1,873 $200 $1,873
41,812
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,240 $2,500 $543
12,103
kWh
$697
-
kW-mo/yr
05 2.7135: Install occupancy sensors $505 $350 $505
11,271
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $356 $72 $217
4,841
kWh
$139
-
kW-mo/yr
TOTAL RECOMMENDED $19,321 $46,097 $10,348
230,996
kWh
$8,973
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs