277
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IA0407 #02 Y:2007 | 02 | 2007 | Utilize higher efficiency lamps and/or ballasts | $2,098 | $4,794 | |
| IA0407 #01 Y:2007 | 01 | 2007 | Utilize higher efficiency lamps and/or ballasts | $132,474 | $185,735 | |
| SD0360 #06 Y:2005 | 06 | 2005 | Install equipment to move product | $232,996 | $340,000 | |
| SD0360 #05 Y:2005 | 05 | 2005 | Install equipment (eg compactor) to reduce disposal costs | $36,000 | $20,000 | |
| SD0360 #04 Y:2005 | 04 | 2005 | Reduce the pressure of compressed air to the minimum required | $3,456 | $3,500 | |
| SD0360 #03 Y:2005 | 03 | 2005 | Use adjustable frequency drive or multiple speed motors on existing system | $61,107 | $38,800 | |
| SD0360 #02 Y:2005 | 02 | 2005 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $82,741 | $534,444 | |
| SD0360 #01 Y:2005 | 01 | 2005 | Replace electrically-operated equipment with fossil fuel equipment | $630,305 | $1,330,000 | |
| LL0190 #10 Y:2004 | 10 | 2004 | Begin a practice of predictive / preventative maintenance | $2,500 | $60 | |
| LL0190 #09 Y:2004 | 09 | 2004 | Install occupancy sensors | $389 | $120 | |
| LL0190 #08 Y:2004 | 08 | 2004 | Utilize higher efficiency lamps and/or ballasts | $411 | $350 | |
| LL0190 #07 Y:2004 | 07 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $635 | $240 | |
| LL0190 #06 Y:2004 | 06 | 2004 | Use photocell controls | $846 | $90 | |
| LL0190 #05 Y:2004 | 05 | 2004 | Reduce the pressure of compressed air to the minimum required | $1,563 | $30 | |
| LL0190 #04 Y:2004 | 04 | 2004 | Install timers on light switches in little used areas | $2,630 | $264 | |
| LL0190 #03 Y:2004 | 03 | 2004 | Reduce illumination to minimum necessary levels | $4,878 | $2,070 | |
| LL0190 #02 Y:2004 | 02 | 2004 | Eliminate or reduce compressed air usage | $27,961 | $1,024 | |
| LL0190 #01 Y:2004 | 01 | 2004 | Utilize controls to operate equipment only when needed | $52,925 | $8,000 | |
| BD0217 #09 Y:2002 | 09 | 2002 | Automate payroll system | $2,945 | $2,495 | |
| BD0217 #08 Y:2002 | 08 | 2002 | Modify startup/shutdown times | $3,668 | $4,000 |