Assessment Year | 2004 |
---|---|
Principal Product | Plate Glass |
NAICS | 327211: Flat Glass Manufacturing |
SIC | 3211: Flat Glass |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
185,000
ft2
|
Annual Production | 130,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $267,279 | 5,702,465 |
kWh
|
$0.047 |
Electricity Demand | $178,713 | 22,236 |
kW-mo/yr
|
$8.04 |
Electricity Fees | $31,763 | - |
|
- |
Natural Gas | $5,966 | 587 |
MMBtu
|
$10.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,738 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,214 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $52,925 | $8,000 |
$49,416
1,054,310
kWh
|
- | $3,509 | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $27,961 | $1,024 |
$26,107
557,003
kWh
|
- | $1,854 | - | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $4,878 | $2,070 |
$3,471
74,056
kWh
|
$1,084
-
kW-mo/yr
|
$323 | - | - | |
04 | 2.7132: Install timers on light switches in little used areas | $2,630 | $264 |
$2,456
52,398
kWh
|
- | $174 | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,563 | $30 |
$1,065
22,731
kWh
|
$394
-
kW-mo/yr
|
$104 | - | - | |
06 | 2.7134: Use photocell controls | $846 | $90 |
$790
16,845
kWh
|
- | $56 | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $635 | $240 |
$593
12,647
kWh
|
- | $42 | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $411 | $350 |
$156
3,329
kWh
|
- | $11 | $122 | $122 | |
09 | 2.7135: Install occupancy sensors | $389 | $120 |
$363
7,752
kWh
|
- | $26 | - | - | |
10 | 4.611: Begin a practice of predictive / preventative maintenance | $2,500 | $60 | - | - | - | - | $2,500 | |
TOTAL RECOMMENDED | $94,738 | $12,248 |
$84,417
1,801,071
kWh
|
$1,478
-
kW-mo/yr
|
$6,099 | $122 | $2,622 | ||
TOTAL IMPLEMENTED | $65,214 | $11,194 |
$57,245
1,221,337
kWh
|
$1,084
-
kW-mo/yr
|
$4,141 | $122 | $2,622 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs