ITAC Assessment: SU0427
ITAC logo
ITAC Assessment: SU0427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Pool Liners
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 120,000
ft2
Annual Production 22,000
units
Production Hrs. Annual 4,250
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,522 1,070,632
kWh
Electricity Demand $37,315 3,617
kW-mo/yr
Electricity Fees $3,643 -
Natural Gas $24,208 4,811
MMBtu
Waste Disposal Costs
Water Usage $650 167,000
Tgal
Solid Waste (non-haz) $60,000 500,000
lb
TOTAL YEARLY COSTS $194,338
RECOMMENDED SAVINGS* $13,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,458

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $442 $317 $442
6,904
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $195 $173 $118
1,839
kWh
$26
-
kW-mo/yr
$28 $23
03 2.6211: Conserve energy by efficient use of vending machines $240 $484 $240
3,755
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,703 $34,086 $7,790
121,720
kWh
$3,546
-
kW-mo/yr
$488 $879
05 2.7135: Install occupancy sensors $124 $556 $124
1,936
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $189 $924 $189
2,949
kWh
- - -
TOTAL RECOMMENDED $13,893 $36,540 $8,903
139,103
kWh
$3,572
-
kW-mo/yr
$516 $902
TOTAL IMPLEMENTED $13,458 $35,883 $8,545
133,509
kWh
$3,546
-
kW-mo/yr
$488 $879
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs