Assessment Year | 1999 |
---|---|
Principal Product | Plumbing fixtures |
NAICS |
n/a
|
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
133,000
ft2
|
Annual Production | 8,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $133,211 | 2,678,781 |
kWh
|
$0.050 |
Electricity Demand | $79,791 | 8,377 |
kW-mo/yr
|
$9.53 |
Electricity Fees | $3,588 | - |
|
- |
Natural Gas | $18,202 | 3,538 |
MMBtu
|
$5.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,115 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,115 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $331 | $725 |
$291
5,862
kWh
|
$40
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,292 | $360 |
$2,840
57,151
kWh
|
$1,452
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $940 | $584 |
$940
19,050
kWh
|
- | - | - | - | |
04 | 2.2437: Recover waste heat from equipment | $1,392 | $1,394 | - | - |
$1,392
-
MMBtu
|
- | - | |
05 | 3.7311: Maintain machines to reduce leaks | $6,160 | - | - | - | - |
$6,160
-
lb
|
- | |
06 | 4.446: Automate finishing process | $67,000 | $9,000 | - | - | - | - | $67,000 | |
TOTAL RECOMMENDED | $80,115 | $12,063 |
$4,071
82,063
kWh
|
$1,492
-
kW-mo/yr
|
$1,392
-
MMBtu
|
$6,160
-
lb
|
$67,000 | ||
TOTAL IMPLEMENTED | $13,115 | $3,063 |
$4,071
82,063
kWh
|
$1,492
-
kW-mo/yr
|
$1,392
-
MMBtu
|
$6,160
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs