Assessment Year | 1994 |
---|---|
Principal Product | Steel Pipes & Tubes |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
135,000
ft2
|
Annual Production | 3,600,000
lb
|
Production Hrs. Annual | 6,257
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $572,852 | 9,497,362 |
kWh
|
$0.060 |
Natural Gas | $17,125 | 3,920 |
MMBtu
|
$4.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $95,657 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,741 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,756 | $800 |
$10,756
178,195
kWh
|
|
02 | 2.7111: Reduce illumination to minimum necessary levels | $5,336 | $1,140 |
$5,336
88,511
kWh
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,883 | $533 |
$1,883
31,360
kWh
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $6,234 | $350 |
$6,234
103,458
kWh
|
|
05 | 2.7243: Improve air circulation with destratification fans / other methods | $5,532 | $5,850 |
$5,532
91,735
kWh
|
|
06 | 2.7232: Replace existing hvac unit with high efficiency model | $38,242 | $143,000 |
$38,242
633,939
kWh
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $500 | $250 |
$500
8,206
kWh
|
|
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,672 | $400 |
$4,672
-
kWh
|
|
09 | 2.3212: Optimize plant power factor | $22,502 | $10,950 |
$22,502
-
kWh
|
|
TOTAL RECOMMENDED | $95,657 | $163,273 |
$95,657
1,135,404
kWh
|
||
TOTAL IMPLEMENTED | $29,741 | $8,673 |
$29,741
493,259
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs