Assessment Year | 2015 |
---|---|
Principal Product | Slitting, Edging, Hardening and Tempering Steel Strip |
NAICS | 331221: Rolled Steel Shape Manufacturing |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
65,000
ft2
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 6,250
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $174,567 | 2,541,000 |
kWh
|
$0.069 |
Electricity Demand | $83,115 | 6,420 |
kW-mo/yr
|
$12.95 |
Natural Gas | $114,047 | 20,343 |
MMBtu
|
$5.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,860 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,138 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $687 | $1,950 |
$687
10,000
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,641 | $8,621 |
$3,656
53,222
kWh
|
$985
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,350 | - |
$1,852
26,952
kWh
|
$498
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,497 | $1,640 |
$2,755
40,105
kWh
|
$742
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,738 | $8,210 |
$3,733
54,334
kWh
|
$1,005
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,868 | $3,500 |
$4,625
67,127
kWh
|
$1,243
-
kW-mo/yr
|
- | |
07 | 2.2511: Insulate bare equipment | $11,151 | $1,631 | - | - |
$11,151
-
MMBtu
|
|
08 | 2.2414: Use waste heat from hot flue gases to preheat | $20,928 | $34,000 | - | - |
$20,928
-
MMBtu
|
|
TOTAL RECOMMENDED | $53,860 | $59,552 |
$17,308
251,740
kWh
|
$4,473
-
kW-mo/yr
|
$32,079
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,138 | $10,261 |
$6,412
93,327
kWh
|
$1,726
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs