ITAC Assessment: GT0438
ITAC logo
ITAC Assessment: GT0438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SNACK CHIPS
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 23,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $432,766 8,156,507
kWh
Natural Gas $273,380 87,795
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,380 - - $9,980
-
MMBtu
$(-600.0)
02 3.4154: Eliminate leaks in water lines and valves $902 - - $902
-
MMBtu
-
03 2.2121: Increase amount of condensate returned $10,480 $3,670 - $10,480
-
MMBtu
-
04 2.2135: Repair and eliminate steam leaks $2,450 $425 - $2,450
-
MMBtu
-
05 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $1,030 $4,500 - $1,030
-
MMBtu
-
06 2.4133: Use most efficient type of electric motors $2,350 $2,570 $2,350
135,991
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,535 - - $1,835
-
MMBtu
$(-300.0)
TOTAL RECOMMENDED $28,127 $11,165 $2,350
135,991
kWh
$26,677
-
MMBtu
$(-900.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs