| Assessment Year | 1989 |
|---|---|
| Principal Product | WOVEN FABRIC |
| NAICS |
n/a
|
| SIC | 2211: Broadwoven Fabric Mills, Cotton |
| Sales Range | $10 M to 50M |
| # of Employees | 490 |
| Plant Area |
n/a
|
| Annual Production | 15,000,000
pieces
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,357,823 | 31,400,059 |
kWh
|
$0.043 |
| Natural Gas | $231,628 | 57,529 |
MMBtu
|
$4.03 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $74,611 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $70,634 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,640 | $2,652 |
$5,640
130,422
kWh
|
- | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $3,162 | $3,143 |
$3,162
73,271
kWh
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,977 | $3,000 |
$3,977
92,028
kWh
|
- | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,529 | $1,000 | - |
$13,529
-
MMBtu
|
- | |
| 05 | 2.7291: Reschedule and rearrange multiple-source heating systems | $18,418 | - | - |
$109,156
-
MMBtu
|
$(-90,738.0)
-
MMBtu
|
|
| 06 | 2.4312: Improve lubrication practices | $9,445 | - |
$9,445
218,640
kWh
|
- | - | |
| 07 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $13,600 | $15,000 |
$13,600
388,335
kWh
|
- | - | |
| 08 | 2.6124: Establish equipment maintenance schedule | $6,840 | $500 |
$6,840
158,265
kWh
|
- | - | |
| TOTAL RECOMMENDED | $74,611 | $25,295 |
$42,664
1,060,961
kWh
|
$122,685
-
MMBtu
|
$(-90,738.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $70,634 | $22,295 |
$38,687
968,933
kWh
|
$122,685
-
MMBtu
|
$(-90,738.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs