ITAC Assessment: UD0502
ITAC logo
ITAC Assessment: UD0502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product toilet paper and paper towels
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 160,000
ft2
Annual Production 97,600
ton
Production Hrs. Annual 8,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,868,000 128,227,434
kWh
Natural Gas $731,000 265,840
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $517,983 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $469,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.6192: Use a less expensive method of waste removal $372,300 $800,000 - - - $372,300
-
lb
- -
02 2.3212: Optimize plant power factor $29,345 $93,000 - $29,345
-
kW-mo/yr
- - - -
03 3.4151: Minimize water usage $48,400 $150 - - $48,400
-
Tgal
- - -
04 2.4226: Use / purchase optimum sized compressor $19,538 $500 $12,346
595,252
kWh
$2,526
-
kW-mo/yr
- - $(-1,000.0) $5,666
05 3.1162: Use less wasteful packaging $48,400 - - - - - - $48,400
TOTAL RECOMMENDED $517,983 $893,650 $12,346
595,252
kWh
$31,871
-
kW-mo/yr
$48,400
-
Tgal
$372,300
-
lb
$(-1,000.0) $54,066
TOTAL IMPLEMENTED $469,583 $893,500 $12,346
595,252
kWh
$31,871
-
kW-mo/yr
- $372,300
-
lb
$(-1,000.0) $54,066
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs