ITAC Assessment: SD0360
ITAC logo
ITAC Assessment: SD0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Flat glass
NAICS 327211: Flat Glass Manufacturing
SIC 3211: Flat Glass
Sales Range $50
M
to 100
M
# of Employees 265
Plant Area 225,000
ft2
Annual Production 268,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,581 45,850
kWh
Electricity Demand $131,452 82,158
kW-mo/yr
Natural Gas $7,952 1,228
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,046,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,563

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $630,305 $1,330,000 $900,612
11,531,520
kWh
$29,568
-
kW-mo/yr
$(-299,875.0)
-
MMBtu
- - -
02 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $82,741 $534,444 $256,020
3,278,105
kWh
$7,584
-
kW-mo/yr
$(-149,373.0)
-
MMBtu
- $(-31,490.0) -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $61,107 $38,800 $59,435
761,011
kWh
$1,672
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,456 $3,500 $3,456
67,376
kWh
- - - - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $36,000 $20,000 - - - $36,000
-
lb
- -
06 4.445: Install equipment to move product $232,996 $340,000 - - - - - $232,996
TOTAL RECOMMENDED $1,046,605 $2,266,744 $1,219,523
15,638,012
kWh
$38,824
-
kW-mo/yr
$(-449,248.0)
-
MMBtu
$36,000
-
lb
$(-31,490.0) $232,996
TOTAL IMPLEMENTED $100,563 $62,300 $62,891
828,387
kWh
$1,672
-
kW-mo/yr
- $36,000
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs