Assessment Year | 2007 |
---|---|
Principal Product | Insulated Galss |
NAICS | 327211: Flat Glass Manufacturing |
SIC | 3211: Flat Glass |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
586,400
ft2
|
Annual Production | 6,411,849
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $958,853 | 24,689,567 |
kWh
|
$0.039 |
Electricity Demand | $639,706 | 64,212 |
kW-mo/yr
|
$9.96 |
Natural Gas | $368,436 | 39,020 |
MMBtu
|
$9.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $180,107 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,924 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $132,474 | $185,735 |
$93,936
2,414,805
kWh
|
$38,538
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,098 | $4,794 |
$1,487
38,234
kWh
|
$611
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,719 | $38,791 |
$17,234
443,040
kWh
|
$8,485
-
kW-mo/yr
|
|
04 | 2.7135: Install occupancy sensors | $3,657 | $4,543 |
$3,657
93,952
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,366 | $1,000 |
$5,808
149,281
kWh
|
$3,558
-
kW-mo/yr
|
|
06 | 2.4133: Use most efficient type of electric motors | $1,084 | $12,025 |
$727
18,684
kWh
|
$357
-
kW-mo/yr
|
|
07 | 2.4239: Eliminate or reduce compressed air usage | $5,709 | $16,692 |
$3,825
98,338
kWh
|
$1,884
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $180,107 | $263,580 |
$126,674
3,256,334
kWh
|
$53,433
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $41,924 | $61,153 |
$28,913
743,191
kWh
|
$13,011
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs