Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,819

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Stone, clay, glass, and concrete products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL0139 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,303 $1,182
KG0040 #05 Y:1995 Install occupancy sensors $650 $195
KG0040 #04 Y:1995 Reduce the pressure of compressed air to the minimum required $937 $20
KG0040 #03 Y:1995 Install timers and/or thermostats $3,469 $900
KG0040 #02 Y:1995 Use synthetic lubricant $2,520 -
KG0040 #01 Y:1995 Use most efficient type of electric motors $8,768 $8,330
DS0038 #04 Y:1995 Upgrade obsolete equipment $4,257 $950
DS0038 #03 Y:1995 Use radiant heater for spot heating $13,083 $12,000
DS0038 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $5,231 $200
DS0038 #01 Y:1995 Use most efficient type of electric motors $6,723 $28,139
UD0472 #05 Y:1995 Recover waste heat from equipment $14,630 $37,500
UD0472 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $4,365 $25,782
UD0472 #03 Y:1995 Use screening, magnetic separation to remove contaminants $5,725 -
UD0472 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $4,193 $300
UD0472 #01 Y:1995 Purchase gas directly from a contract gas supplier $13,440 $30,000
GT0562 #02 Y:1995 Reschedule plant operations or reduce load to avoid peaks $67,980 -
GT0562 #01 Y:1995 Change rate schedules or other changes in utility service $82,460 -
GT0561 #06 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $45,730 $201,600
GT0561 #05 Y:1995 Use screening, magnetic separation to remove contaminants $349,805 $1,000,000
GT0561 #04 Y:1995 Utilize energy-efficient belts and other improved mechanisms $1,950 $4,550