| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0886 #02 Y:2014 | 02 | 2014 | Reduce temperature of process equipment when on standby | $17,969 | - | |
| OK0886 #01 Y:2014 | 01 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $13,646 | $17,062 | |
| MZ0048 #07 Y:2010 | 07 | 2010 | Eliminate or reduce compressed air usage | $62,629 | $5,600 | |
| MZ0048 #06 Y:2010 | 06 | 2010 | Use most efficient type of electric motors | $11,307 | $5,859 | |
| MZ0048 #05 Y:2010 | 05 | 2010 | Turn off equipment when not in use | $5,639 | - | |
| MZ0048 #04 Y:2010 | 04 | 2010 | Reduce the pressure of compressed air to the minimum required | $3,649 | - | |
| MZ0048 #03 Y:2010 | 03 | 2010 | Optimize plant power factor | $36,058 | $92,296 | |
| MZ0048 #02 Y:2010 | 02 | 2010 | Install compressor air intakes in coolest locations | $4,520 | $1,160 | |
| MZ0048 #01 Y:2010 | 01 | 2010 | Reschedule plant operations or reduce load to avoid peaks | $12,738 | $3,000 | |
| OK0753 #09 Y:2007 | 09 | 2007 | Utilize higher efficiency lamps and/or ballasts | $1,439 | $4,489 | |
| OK0753 #08 Y:2007 | 08 | 2007 | Begin a practice of predictive / preventative maintenance | $1,000 | - | |
| OK0753 #07 Y:2007 | 07 | 2007 | Use cooling tower water instead of refrigeration | $3,437 | $13,500 | |
| OK0753 #06 Y:2007 | 06 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $6,715 | $4,795 | |
| OK0753 #05 Y:2007 | 05 | 2007 | Modify process to reduce material use/cost | $387,006 | $553,000 | |
| OK0753 #04 Y:2007 | 04 | 2007 | Insulate bare equipment | $4,874 | $9,950 | |
| OK0753 #03 Y:2007 | 03 | 2007 | Reduce the pressure of compressed air to the minimum required | $1,786 | $3,600 | |
| OK0753 #02 Y:2007 | 02 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,594 | $289 | |
| OK0753 #01 Y:2007 | 01 | 2007 | Optimize plant power factor | $49,649 | - | |
| OK0703 #08 Y:2004 | 08 | 2004 | Use demand controller or load shedder | $21,564 | $1,025 | |
| OK0703 #07 Y:2004 | 07 | 2004 | Change rate schedules or other changes in utility service | $1,250 | - |