Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0886 #02 Y:2014 Reduce temperature of process equipment when on standby $17,969 -
OK0886 #01 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $13,646 $17,062
MZ0048 #07 Y:2010 Eliminate or reduce compressed air usage $62,629 $5,600
MZ0048 #06 Y:2010 Use most efficient type of electric motors $11,307 $5,859
MZ0048 #05 Y:2010 Turn off equipment when not in use $5,639 -
MZ0048 #04 Y:2010 Reduce the pressure of compressed air to the minimum required $3,649 -
MZ0048 #03 Y:2010 Optimize plant power factor $36,058 $92,296
MZ0048 #02 Y:2010 Install compressor air intakes in coolest locations $4,520 $1,160
MZ0048 #01 Y:2010 Reschedule plant operations or reduce load to avoid peaks $12,738 $3,000
OK0753 #09 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,439 $4,489
OK0753 #08 Y:2007 Begin a practice of predictive / preventative maintenance $1,000 -
OK0753 #07 Y:2007 Use cooling tower water instead of refrigeration $3,437 $13,500
OK0753 #06 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $6,715 $4,795
OK0753 #05 Y:2007 Modify process to reduce material use/cost $387,006 $553,000
OK0753 #04 Y:2007 Insulate bare equipment $4,874 $9,950
OK0753 #03 Y:2007 Reduce the pressure of compressed air to the minimum required $1,786 $3,600
OK0753 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $1,594 $289
OK0753 #01 Y:2007 Optimize plant power factor $49,649 -
OK0703 #08 Y:2004 Use demand controller or load shedder $21,564 $1,025
OK0703 #07 Y:2004 Change rate schedules or other changes in utility service $1,250 -