ITAC Assessment: OK0753
ITAC logo
ITAC Assessment: OK0753
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Small plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 65,000
ft2
Annual Production 300,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $463,056 8,383,120
kWh
Electricity Demand $5,401 866
kW-mo/yr
Natural Gas $12,329 957
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $457,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.3212: Optimize plant power factor $49,649 - - - $49,649 - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,594 $289 $816
31,005
kWh
$578
-
kW-mo/yr
- - $200 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,786 $3,600 $1,045
39,700
kWh
$741
-
kW-mo/yr
- - - -
04 2.2511: Insulate bare equipment $4,874 $9,950 $4,874
89,262
kWh
- - - - -
05 4.131: Modify process to reduce material use/cost $387,006 $553,000 $50,964
933,410
kWh
- - $12,243 $29,645 $294,154
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,715 $4,795 $6,715
255,027
kWh
- - - - -
07 2.2612: Use cooling tower water instead of refrigeration $3,437 $13,500 $3,437
130,551
kWh
- - - - -
08 4.611: Begin a practice of predictive / preventative maintenance $1,000 - - - - - $1,000 -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,439 $4,489 $843
32,044
kWh
$598
-
kW-mo/yr
- - $(-2.0) -
TOTAL RECOMMENDED $457,500 $589,623 $68,694
1,510,999
kWh
$1,917
-
kW-mo/yr
$49,649 $12,243 $30,843 $294,154
TOTAL IMPLEMENTED $49,649 - - - $49,649 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs