ITAC Assessment: KG0062
ITAC logo
ITAC Assessment: KG0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Chicken fried steak, beef and chicken fajitas
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 72,136
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,374 7,986,811
kWh
Electricity Demand $214,237 15,846
kW-mo/yr
Electricity Fees $15,083 -
Natural Gas $95,486 49,465
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $139,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $103,572

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.2694: Use highest temperature for chilling or cold storage $48,359 $50 $27,235
1,047,773
kWh
$21,124
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,928 $44,000 $8,490
99,355
kWh
$3,438
-
kW-mo/yr
- -
03 2.2626: Avoid frost formation on evaporators $12,480 $4,500 $8,325
308,324
kWh
$4,155
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $12,393 $35,270 $6,725
258,793
kWh
$5,668
-
kW-mo/yr
- -
05 2.2626: Avoid frost formation on evaporators $1,596 $3,000 $1,596
61,547
kWh
- - -
06 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $906 $2,204 $452
17,292
kWh
$454
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $629 $314 $272
10,551
kWh
$357
-
kW-mo/yr
- -
08 2.7261: Install timers and/or thermostats $599 $300 $599
23,154
kWh
- - -
09 3.4113: Treat and reuse rinse waters $21,972 - - - - $21,972
-
gal
10 3.4113: Treat and reuse rinse waters $23,328 - - - $23,328
-
Tgal
-
11 3.4116: Meter recycled water (to reduce sewer charges) $5,789 - - - $5,789
-
Tgal
-
TOTAL RECOMMENDED $139,979 $89,638 $53,694
1,826,789
kWh
$35,196
-
kW-mo/yr
$29,117
-
Tgal
$21,972
-
gal
TOTAL IMPLEMENTED $103,572 $84,838 $44,770
1,495,311
kWh
$31,041
-
kW-mo/yr
$5,789
-
Tgal
$21,972
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs