Assessment Year | 1995 |
---|---|
Principal Product | Flat Rolled Copper Alloys |
NAICS |
n/a
|
SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
418,300
ft2
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $869,632 | 10,055,979 |
kWh
|
$0.086 |
Natural Gas | $231,808 | 44,978 |
MMBtu
|
$5.15 |
Fuel Oil #4 | $107,604 | 57,721 |
MMBtu
|
$1.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $188,198 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $93,894 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $62,376 | $150,000 | - |
$12,100
-
MMBtu
|
$50,276
-
MMBtu
|
- | - | - | |
02 | 2.6218: Turn off equipment when not in use | $20,120 | $1,500 |
$20,120
232,708
kWh
|
- | - | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,158 | $2,200 |
$6,158
71,219
kWh
|
- | - | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $6,082 | $17,946 |
$6,082
70,340
kWh
|
- | - | - | - | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $2,750 | $500 |
$3,420
39,566
kWh
|
- | - |
$(-670.0)
-
Tgal
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $684 | $578 |
$684
11,723
kWh
|
- | - | - | - | - | |
07 | 2.2136: Install / repair insulation on steam lines | $384 | $945 | - | - |
$384
-
MMBtu
|
- | - | - | |
08 | 3.3133: Use other waste concentration methods | $61,150 | $85,000 |
$49,000
628,664
kWh
|
- | - | - | - |
$12,150
-
gal
|
|
09 | 3.5242: Recover metals from spent solutions and recycle | $28,494 | $57,500 |
$(-5,094.0)
(-65,358)
kWh
|
- | - | - |
$(-101.0)
-
gal
|
$33,689
-
gal
|
|
TOTAL RECOMMENDED | $188,198 | $316,169 |
$80,370
988,862
kWh
|
$12,100
-
MMBtu
|
$50,660
-
MMBtu
|
$(-670.0)
-
Tgal
|
$(-101.0)
-
gal
|
$45,839
-
gal
|
||
TOTAL IMPLEMENTED | $93,894 | $107,591 |
$81,360
1,002,931
kWh
|
- |
$384
-
MMBtu
|
- | - |
$12,150
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs