ITAC Assessment: MA0322
ITAC logo
ITAC Assessment: MA0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Flat Rolled Copper Alloys
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 418,300
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $869,632 10,055,979
kWh
Natural Gas $231,808 44,978
MMBtu
Fuel Oil #4 $107,604 57,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,198 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,894

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
01 2.7224: Reduce space conditioning during non-working hours $62,376 $150,000 - $12,100
-
MMBtu
$50,276
-
MMBtu
- - -
02 2.6218: Turn off equipment when not in use $20,120 $1,500 $20,120
232,708
kWh
- - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,158 $2,200 $6,158
71,219
kWh
- - - - -
04 2.4133: Use most efficient type of electric motors $6,082 $17,946 $6,082
70,340
kWh
- - - - -
05 2.4322: Use or replace with energy efficient substitutes $2,750 $500 $3,420
39,566
kWh
- - $(-670.0)
-
Tgal
- -
06 2.4221: Install compressor air intakes in coolest locations $684 $578 $684
11,723
kWh
- - - - -
07 2.2136: Install / repair insulation on steam lines $384 $945 - - $384
-
MMBtu
- - -
08 3.3133: Use other waste concentration methods $61,150 $85,000 $49,000
628,664
kWh
- - - - $12,150
-
gal
09 3.5242: Recover metals from spent solutions and recycle $28,494 $57,500 $(-5,094.0)
(-65,358)
kWh
- - - $(-101.0)
-
gal
$33,689
-
gal
TOTAL RECOMMENDED $188,198 $316,169 $80,370
988,862
kWh
$12,100
-
MMBtu
$50,660
-
MMBtu
$(-670.0)
-
Tgal
$(-101.0)
-
gal
$45,839
-
gal
TOTAL IMPLEMENTED $93,894 $107,591 $81,360
1,002,931
kWh
- $384
-
MMBtu
- - $12,150
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs