ITAC Assessment: CO0311
ITAC logo
ITAC Assessment: CO0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product fabricated metal parts
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 125
Plant Area 80,000
ft2
Annual Production 1,666,000
lb
Production Hrs. Annual 4,290
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,790 1,619,871
kWh
Natural Gas $38,410 10,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Gaseous Waste Savings
01 3.2124: Convert to air assisted / airless paint guns $53,800 $7,000 - - - $2,000
-
lb
$51,800
-
lb
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,400 $570 $3,400
68,875
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,320 $3,890 $2,320
47,186
kWh
- - - -
04 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner $2,020 $3,500 - - $830
-
gal
- $1,190
-
lb
05 2.2414: Use waste heat from hot flue gases to preheat $2,030 $5,700 - $2,030
-
MMBtu
- - -
06 2.4221: Install compressor air intakes in coolest locations $460 $400 $460
9,379
kWh
- - - -
TOTAL RECOMMENDED $64,030 $21,060 $6,180
125,440
kWh
$2,030
-
MMBtu
$830
-
gal
$2,000
-
lb
$52,990
-
lb
TOTAL IMPLEMENTED $3,860 $970 $3,860
78,254
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Gaseous Waste Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs