Assessment Year | 2005 |
---|---|
Principal Product | Plastic Products |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
800,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $932,608 | 32,536,452 |
kWh
|
$0.029 |
Electricity Demand | $334,367 | 55,746 |
kW-mo/yr
|
$6.00 |
Electricity Fees | $5,460 | - |
|
- |
Natural Gas | $50,262 | 6,817 |
MMBtu
|
$7.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $187,803 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $73,862 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $37,468 | $34,300 |
$37,468
1,305,510
kWh
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,044 | $25,020 |
$7,044
245,462
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $36,596 | $39,180 |
$36,596
1,275,134
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $53,659 | $1,739 |
$53,659
1,372,341
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,204 | $1,727 |
$16,484
574,380
kWh
|
$4,720
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,018 | $22,540 |
$7,011
244,277
kWh
|
$2,007
-
kW-mo/yr
|
- | |
07 | 2.8114: Change rate schedules or other changes in utility service | $1,250 | - | - | - | $1,250 | |
08 | 2.3191: Use demand controller or load shedder | $21,564 | $1,025 | - |
$21,564
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $187,803 | $125,531 |
$158,262
5,017,104
kWh
|
$28,291
-
kW-mo/yr
|
$1,250 | ||
TOTAL IMPLEMENTED | $73,862 | $88,467 |
$67,135
2,339,253
kWh
|
$6,727
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs