ITAC Assessment: CO0272
ITAC logo
ITAC Assessment: CO0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Injection Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 485
Plant Area 180,000
ft2
Annual Production 5,500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,659 3,847,011
kWh
Natural Gas $27,344 6,958
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,890

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $1,930 $250 - - $1,930
02 2.4221: Install compressor air intakes in coolest locations $980 $350 $980
19,343
kWh
- -
03 2.4226: Use / purchase optimum sized compressor $960 $2,500 $960
50,703
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $400 $820 $400
7,913
kWh
- -
06 2.7243: Improve air circulation with destratification fans / other methods $2,950 $10,000 - $2,950
-
MMBtu
-
TOTAL RECOMMENDED $7,220 $13,920 $2,340
77,959
kWh
$2,950
-
MMBtu
$1,930
TOTAL IMPLEMENTED $2,890 $2,750 $960
50,703
kWh
- $1,930
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs