976
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Plastics bottles | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0938 #06 Y:2016 | 06 | 2016 | Replace dc equipment with ac equipment | $5,044 | $44,525 | |
| OK0938 #05 Y:2016 | 05 | 2016 | Install set-back timers | $317 | $344 | |
| OK0938 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $13,124 | $3,000 | |
| OK0938 #03 Y:2016 | 03 | 2016 | Install compressor air intakes in coolest locations | $16,558 | $4,930 | |
| OK0938 #02 Y:2016 | 02 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $45,405 | $59,664 | |
| OK0938 #01 Y:2016 | 01 | 2016 | Reduce the pressure of compressed air to the minimum required | $34,651 | $40,660 | |
| WM0083 #08 Y:2015 | 08 | 2015 | Conserve energy by efficient use of vending machines | $273 | $695 | |
| WM0083 #07 Y:2015 | 07 | 2015 | Reduce illumination to minimum necessary levels | $1,105 | $2,490 | |
| WM0083 #06 Y:2015 | 06 | 2015 | Install occupancy sensors | $1,673 | $1,425 | |
| WM0083 #05 Y:2015 | 05 | 2015 | Insulate bare equipment | $12,261 | $1,680 | |
| WM0083 #04 Y:2015 | 04 | 2015 | Utilize higher efficiency lamps and/or ballasts | $13,901 | $15,200 | |
| WM0083 #03 Y:2015 | 03 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $27,491 | $7,200 | |
| WM0083 #02 Y:2015 | 02 | 2015 | Install compressor air intakes in coolest locations | $34,888 | $8,785 | |
| WM0083 #01 Y:2015 | 01 | 2015 | Install motor voltage controller on lightly loaded motors | $61,468 | $22,995 | |
| CO0720 #05 Y:2015 | 05 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $930 | $1,330 | |
| CO0720 #04 Y:2015 | 04 | 2015 | Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $5,510 | $27,600 | |
| CO0720 #03 Y:2015 | 03 | 2015 | Utilize higher efficiency lamps and/or ballasts | $14,190 | $67,155 | |
| CO0720 #02 Y:2015 | 02 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,840 | $300 | |
| CO0720 #01 Y:2015 | 01 | 2015 | Use or replace with energy efficient substitutes | $14,640 | $62,670 | |
| SU0407 #10 Y:2015 | 10 | 2015 | Pay bills on time to avoid late fees | $1,597 | - |