ITAC Assessment: SU0407
ITAC logo
ITAC Assessment: SU0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Blow Molded Plastic Parts
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 121,474
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $731,001 16,242,225
kWh
Electricity Demand $271,250 29,455
kW-mo/yr
Electricity Fees $64,482 -
Natural Gas $48,163 8,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,597

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $76 - $43
945
kWh
$33
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,191 $1,340 $22,191
493,136
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $8,289 $737 $8,289
184,203
kWh
- - -
04 2.7314: Reduce ventilation air $5,800 $523 $441
9,811
kWh
$124
-
kW-mo/yr
$5,235
-
MMBtu
-
05 3.1161: Eliminate/reduce an operation $2,255 $1,215 $(-41.0)
(-912)
kWh
$(-332.0)
-
kW-mo/yr
- $2,628
06 2.2136: Install / repair insulation on steam lines $231 $370 - - $231
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $219 $312 $110
2,453
kWh
$31
-
kW-mo/yr
- $78
08 2.7224: Reduce space conditioning during non-working hours $181 $259 - - $181
-
MMBtu
-
09 2.6211: Conserve energy by efficient use of vending machines $262 $591 $262
5,820
kWh
- - -
10 4.821: Pay bills on time to avoid late fees $1,597 - - - - $1,597
TOTAL RECOMMENDED $41,101 $5,347 $31,295
695,456
kWh
$(-144.0)
-
kW-mo/yr
$5,647
-
MMBtu
$4,303
TOTAL IMPLEMENTED $1,597 - - - - $1,597
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs