Assessment Year | 2016 |
---|---|
Principal Product | Plastic bottles |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 29 |
Plant Area |
148,232
ft2
|
Annual Production | 90,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $627,007 | 15,828,155 |
kWh
|
$0.040 |
Electricity Demand | $663,885 | 35,579 |
kW-mo/yr
|
$18.66 |
Electricity Fees | $4,435 | - |
|
- |
Natural Gas | $15,380 | 2,110 |
MMBtu
|
$7.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,030 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $14,640 | $62,670 |
$6,630
180,000
kWh
|
$8,010
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,840 | $300 |
$2,860
77,800
kWh
|
$1,980
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,190 | $67,155 |
$11,980
325,100
kWh
|
$8,790
-
kW-mo/yr
|
$780 | $(-7,360.0) | |
04 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $5,510 | $27,600 |
$1,130
30,800
kWh
|
$4,380
-
kW-mo/yr
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $930 | $1,330 |
$550
14,900
kWh
|
$380
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $40,110 | $159,055 |
$23,150
628,600
kWh
|
$23,540
-
kW-mo/yr
|
$780 | $(-7,360.0) | ||
TOTAL IMPLEMENTED | $19,030 | $67,455 |
$14,840
402,900
kWh
|
$10,770
-
kW-mo/yr
|
$780 | $(-7,360.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs