Assessment Year | 2000 |
---|---|
Principal Product | corrugated packaging |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
143,000
ft2
|
Annual Production | 13,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,685 | 2,521,395 |
kWh
|
$0.019 |
Electricity Demand | $76,967 | 5,847 |
kW-mo/yr
|
$13.16 |
Electricity Fees | $205 | - |
|
- |
Natural Gas | $50,280 | 15,000 |
MMBtu
|
$3.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $5,600 | $2,200 |
$2,230
122,802
kWh
|
$3,370
-
kW-mo/yr
|
- | - | - | |
02 | 2.3191: Use demand controller or load shedder | $4,200 | $7,000 | - |
$4,200
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,400 | $350 |
$700
38,687
kWh
|
$1,060
-
kW-mo/yr
|
- | $(-360.0) | - | |
04 | 2.7124: Make a practice of turning off lights when not needed | $1,060 | - |
$1,060
58,617
kWh
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $620 | $100 |
$250
13,482
kWh
|
$370
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $470 | - |
$800
43,669
kWh
|
$1,200
-
kW-mo/yr
|
- | $(-140.0) | $(-1,390.0) | |
07 | 3.6192: Use a less expensive method of waste removal | $40 | - | - | - |
$70
-
lb
|
- | $(-30.0) | |
TOTAL RECOMMENDED | $13,390 | $9,650 |
$5,040
277,257
kWh
|
$10,200
-
kW-mo/yr
|
$70
-
lb
|
$(-500.0) | $(-1,420.0) | ||
TOTAL IMPLEMENTED | $7,000 | $2,550 |
$2,930
161,489
kWh
|
$4,430
-
kW-mo/yr
|
- | $(-360.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs