ITAC Assessment: CO0464
ITAC logo
ITAC Assessment: CO0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product corrugated packaging
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 143,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,685 2,521,395
kWh
Electricity Demand $76,967 5,847
kW-mo/yr
Electricity Fees $205 -
Natural Gas $50,280 15,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $5,600 $2,200 $2,230
122,802
kWh
$3,370
-
kW-mo/yr
- - -
02 2.3191: Use demand controller or load shedder $4,200 $7,000 - $4,200
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,400 $350 $700
38,687
kWh
$1,060
-
kW-mo/yr
- $(-360.0) -
04 2.7124: Make a practice of turning off lights when not needed $1,060 - $1,060
58,617
kWh
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $620 $100 $250
13,482
kWh
$370
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $470 - $800
43,669
kWh
$1,200
-
kW-mo/yr
- $(-140.0) $(-1,390.0)
07 3.6192: Use a less expensive method of waste removal $40 - - - $70
-
lb
- $(-30.0)
TOTAL RECOMMENDED $13,390 $9,650 $5,040
277,257
kWh
$10,200
-
kW-mo/yr
$70
-
lb
$(-500.0) $(-1,420.0)
TOTAL IMPLEMENTED $7,000 $2,550 $2,930
161,489
kWh
$4,430
-
kW-mo/yr
- $(-360.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs