Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

711

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics pipe
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0418 #05 Y:2008 Eliminate or reduce compressed air usage $1,900 $800
UF0418 #04 Y:2008 Reduce the pressure of compressed air to the minimum required $4,106 -
UF0418 #03 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $3,047 $1,060
UF0418 #02 Y:2008 Install common header on compressors $4,076 $2,560
UF0418 #01 Y:2008 Install compressor air intakes in coolest locations $20,962 $1,500
LL0304 #07 Y:2008 Utilize higher efficiency lamps and/or ballasts $101 $70
LL0304 #06 Y:2008 Conserve energy by efficient use of vending machines $823 $1,246
LL0304 #05 Y:2008 Reduce space conditioning during non-working hours $1,456 $825
LL0304 #04 Y:2008 Reduce the pressure of compressed air to the minimum required $5,714 $30
LL0304 #03 Y:2008 Insulate bare equipment $9,892 $1,118
LL0304 #02 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $57,876 $20,949
LL0304 #01 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $59,266 $14,840
MI0171 #06 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $31,317 $1,210
MI0171 #05 Y:2008 Turn off equipment when not in use $42,003 $860
MI0171 #04 Y:2008 Utilize higher efficiency lamps and/or ballasts $101,069 $53,922
MI0171 #03 Y:2008 Use or replace with energy efficient substitutes $110,098 $168,305
MI0171 #02 Y:2008 Install / repair insulation on steam lines $131,514 $7,800
MI0171 #01 Y:2008 Replace existing chiller with high efficiency model $170,598 $351,000
OK0767 #08 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $15,751 -
OK0767 #07 Y:2008 Install timers and/or thermostats $46,431 $6,300