Assessment Year | 2008 |
---|---|
Principal Product | PVC Pipe and fittings |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $50 M to 100M |
# of Employees | 137 |
Plant Area |
500,000
ft2
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,098,237 | 18,716,544 |
kWh
|
$0.059 |
Natural Gas | $100,709 | 9,080 |
MMBtu
|
$11.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $135,128 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $59,367 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $59,266 | $14,840 |
$59,266
1,009,982
kWh
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $57,876 | $20,949 |
$57,876
986,307
kWh
|
- | - | |
03 | 2.2511: Insulate bare equipment | $9,892 | $1,118 | - |
$9,892
-
MMBtu
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,714 | $30 |
$5,714
97,378
kWh
|
- | - | |
05 | 2.7224: Reduce space conditioning during non-working hours | $1,456 | $825 |
$1,456
24,815
kWh
|
- | - | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $823 | $1,246 |
$823
14,018
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $101 | $70 |
$39
666
kWh
|
- | $62 | |
TOTAL RECOMMENDED | $135,128 | $39,078 |
$125,174
2,133,166
kWh
|
$9,892
-
MMBtu
|
$62 | ||
TOTAL IMPLEMENTED | $59,367 | $14,910 |
$59,305
1,010,648
kWh
|
- | $62 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs