| Assessment Year | 2008 |
|---|---|
| Principal Product | plastic piping |
| NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 398 |
| Plant Area |
100,000
ft2
|
| Annual Production | 3,500,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Puerto Rico |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,331,949 | 12,876,600 |
kWh
|
$0.18 |
| Electricity Demand | $250,588 | 31,129 |
kW-mo/yr
|
$8.05 |
| Electricity Fees | $5,400 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $586,599 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $170,598 | $351,000 |
$157,834
1,099,123
kWh
|
$12,764
-
kW-mo/yr
|
|
| 02 | 2.2136: Install / repair insulation on steam lines | $131,514 | $7,800 |
$121,586
846,702
kWh
|
$9,928
-
kW-mo/yr
|
|
| 03 | 2.4322: Use or replace with energy efficient substitutes | $110,098 | $168,305 |
$101,859
709,234
kWh
|
$8,239
-
kW-mo/yr
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $101,069 | $53,922 |
$93,644
652,111
kWh
|
$7,425
-
kW-mo/yr
|
|
| 05 | 2.6218: Turn off equipment when not in use | $42,003 | $860 |
$38,917
271,009
kWh
|
$3,086
-
kW-mo/yr
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $31,317 | $1,210 |
$26,959
187,740
kWh
|
$4,358
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $586,599 | $583,097 |
$540,799
3,765,919
kWh
|
$45,800
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs