| Assessment Year | 2013 |
|---|---|
| Principal Product | Stainless Steel Tanks |
| NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $100 M to 500M |
| # of Employees | 568 |
| Plant Area |
750,000
ft2
|
| Annual Production | 35,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $373,751 | 8,797,752 |
kWh
|
$0.042 |
| Electricity Demand | $250,304 | 23,411 |
kW-mo/yr
|
$10.69 |
| Natural Gas | $179,547 | 32,274 |
MMBtu
|
$5.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $105,409 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $63,294 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $53,250 | $61,965 |
$39,171
922,111
kWh
|
$14,079
-
kW-mo/yr
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $22,321 | $12,640 |
$15,704
369,676
kWh
|
$6,617
-
kW-mo/yr
|
- | - | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,044 | $2,500 | - | - |
$10,044
-
MMBtu
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,322 | $1,333 |
$4,693
110,477
kWh
|
$1,689
-
kW-mo/yr
|
- | $(-60.0) | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $5,688 | $16,575 | - | - |
$5,688
-
MMBtu
|
- | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $4,932 | $2,000 |
$3,628
85,400
kWh
|
$1,304
-
kW-mo/yr
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $2,852 | $1,614 | - | - |
$2,852
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $105,409 | $98,627 |
$63,196
1,487,664
kWh
|
$23,689
-
kW-mo/yr
|
$18,584
-
MMBtu
|
$(-60.0) | ||
| TOTAL IMPLEMENTED | $63,294 | $64,465 |
$39,171
922,111
kWh
|
$14,079
-
kW-mo/yr
|
$10,044
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs