ITAC Assessment: SD0311
ITAC logo
ITAC Assessment: SD0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Portable Process Instrumentation
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 61,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,391 644,486
kWh
Electricity Demand $21,028 2,461
kW-mo/yr
Natural Gas $150 20
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $10,146 $19,000 $10,146
77,511
kWh
- -
02 2.7134: Use photocell controls $3,064 $2,000 $2,014
15,390
kWh
$1,050
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $501 - $371
2,837
kWh
$130
-
kW-mo/yr
-
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,622 $5,000 - - $2,622
05 4.522: Modify storage space to avoid rental of a warehouse $31,104 - - - $31,104
TOTAL RECOMMENDED $47,437 $26,000 $12,531
95,738
kWh
$1,180
-
kW-mo/yr
$33,726
TOTAL IMPLEMENTED $6,187 $7,000 $2,385
18,227
kWh
$1,180
-
kW-mo/yr
$2,622
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs