221
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Unsupported plastics profile shapes | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MZ0192 #03 Y:2015 | 03 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,247 | $920 | |
| MZ0192 #02 Y:2015 | 02 | 2015 | Eliminate or reduce compressed air usage | $11,360 | $6,100 | |
| MZ0192 #01 Y:2015 | 01 | 2015 | Install compressor air intakes in coolest locations | $2,801 | $1,160 | |
| NC0516 #09 Y:2014 | 09 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $467 | $50 | |
| NC0516 #08 Y:2014 | 08 | 2014 | Reduce the pressure of compressed air to the minimum required | $798 | $50 | |
| NC0516 #07 Y:2014 | 07 | 2014 | Install outside air damper / economizer on hvac unit | $2,479 | $5,500 | |
| NC0516 #06 Y:2014 | 06 | 2014 | Use cooling tower water instead of refrigeration | $1,840 | $8,000 | |
| NC0516 #05 Y:2014 | 05 | 2014 | Install occupancy sensors | $587 | $1,594 | |
| NC0516 #04 Y:2014 | 04 | 2014 | Utilize higher efficiency lamps and/or ballasts | $272 | $80 | |
| NC0516 #03 Y:2014 | 03 | 2014 | Reduce illumination to minimum necessary levels | $218 | $75 | |
| NC0516 #02 Y:2014 | 02 | 2014 | Utilize higher efficiency lamps and/or ballasts | $1,207 | $1,497 | |
| NC0516 #01 Y:2014 | 01 | 2014 | Utilize higher efficiency lamps and/or ballasts | $12,076 | $24,656 | |
| NC0411 #05 Y:2010 | 05 | 2010 | Use power during off-peak periods | $400 | $100 | |
| NC0411 #04 Y:2010 | 04 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,307 | $100 | |
| NC0411 #03 Y:2010 | 03 | 2010 | Use / purchase optimum sized compressor | $4,708 | $500 | |
| NC0411 #02 Y:2010 | 02 | 2010 | Upgrade controls on compressors | $15,453 | $30,000 | |
| NC0411 #01 Y:2010 | 01 | 2010 | Reschedule plant operations or reduce load to avoid peaks | $6,139 | $5,000 | |
| UD0807 #17 Y:2009 | 17 | 2009 | Utilize higher efficiency lamps and/or ballasts | $2,776 | $2,533 | |
| UD0807 #16 Y:2009 | 16 | 2009 | Meter recycled water (to reduce sewer charges) | $2,970 | $2,000 | |
| UD0807 #15 Y:2009 | 15 | 2009 | Insulate bare equipment | $3,086 | $2,700 |