ITAC Assessment: MZ0192
ITAC logo
ITAC Assessment: MZ0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product extruded rubber products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 102,000
ft2
Annual Production 18,000
pieces
Production Hrs. Annual 6,580
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,637 1,050,240
kWh
Electricity Demand $11,854 3,721
kW-mo/yr
Natural Gas $7,536 753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,273 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,619

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $2,801 $1,160 $2,633
28,919
kWh
$168
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $11,360 $6,100 $11,360
126,226
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,247 $920 $2,109
23,877
kWh
$138
-
kW-mo/yr
04 2.5122: Replace high resistance ducts, pipes, and fittings $8,654 $19,200 $8,130
90,335
kWh
$524
-
kW-mo/yr
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,211 - $2,211
24,280
kWh
-
TOTAL RECOMMENDED $27,273 $27,380 $26,443
293,637
kWh
$830
-
kW-mo/yr
TOTAL IMPLEMENTED $18,619 $8,180 $18,313
203,302
kWh
$306
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs