ITAC Assessment: UD0624
ITAC logo
ITAC Assessment: UD0624
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Solenoids
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 104,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,300 2,583,300
kWh
Electricity Demand $110,104 7,944
kW-mo/yr
Natural Gas $14,956 1,778
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $29,813 $10,710 $66
2,975
kWh
$118
-
kW-mo/yr
$30,129
-
Tgal
$(-500.0)
-
gal
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,975 $13,704 $3,581
162,750
kWh
$7,394
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $980 $414 $308
14,000
kWh
$672
-
kW-mo/yr
- - -
04 3.4116: Meter recycled water (to reduce sewer charges) $281 $500 - - - - $281
TOTAL RECOMMENDED $42,049 $25,328 $3,955
179,725
kWh
$8,184
-
kW-mo/yr
$30,129
-
Tgal
$(-500.0)
-
gal
$281
TOTAL IMPLEMENTED $11,955 $14,118 $3,889
176,750
kWh
$8,066
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs