ITAC Assessment: MI0357
ITAC logo
ITAC Assessment: MI0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Utility Connectors
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 142,000
ft2
Annual Production 16,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $423,000 8,962,050
kWh
Electricity Demand $218,181 21,131
kW-mo/yr
Electricity Fees $119,586 -
Natural Gas $6,558 1,119
MMBtu
TOTAL YEARLY COSTS $767,325
RECOMMENDED SAVINGS* $47,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $18,306 $3,600 $18,306
389,497
kWh
- -
02 2.9112: Use solar heat to heat water $11,005 $67,338 $7,691
163,639
kWh
$3,314
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,689 $1,980 $3,584
76,248
kWh
$1,105
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,177 $2,193 $2,917
62,065
kWh
$1,260
-
kW-mo/yr
-
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,870 $8,000 $3,870
82,351
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,575 $160 $1,966
41,824
kWh
$609
-
kW-mo/yr
-
07 2.6127: Maintain air filters by cleaning or replacement $1,267 $1,195 $885
18,835
kWh
$382
-
kW-mo/yr
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $996 $2,040 - - $996
-
MMBtu
09 2.4231: Reduce the pressure of compressed air to the minimum required $558 $1,773 $558
11,875
kWh
- -
TOTAL RECOMMENDED $47,443 $88,279 $39,777
846,334
kWh
$6,670
-
kW-mo/yr
$996
-
MMBtu
TOTAL IMPLEMENTED $31,703 $16,975 $28,611
608,755
kWh
$2,096
-
kW-mo/yr
$996
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs