ITAC Assessment: UD0807
ITAC logo
ITAC Assessment: UD0807
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Custom profile extrusions for windows, doors and office furniture
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $954,373 17,913,059
kWh
Natural Gas $40,334 4,139
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $264,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $11,275 $2,000 $8,286
230,160
kWh
$2,989
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,575 $1,000 $6,199
172,000
kWh
$2,236
-
kW-mo/yr
- - $(-3,360.0) $(-500.0)
03 2.4239: Eliminate or reduce compressed air usage $65,548 $15,550 $48,172
1,338,120
kWh
$17,376
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $1,604 $1,000 $1,179
30,760
kWh
$425
-
kW-mo/yr
- - - -
05 2.4226: Use / purchase optimum sized compressor $12,056 $52,550 $8,860
246,120
kWh
$3,196
-
kW-mo/yr
- - - -
06 2.4224: Upgrade controls on compressors $1,564 $7,000 $1,149
31,920
kWh
$415
-
kW-mo/yr
- - - -
07 2.3212: Optimize plant power factor $78,142 $100,000 - - $78,142 - - -
08 2.2612: Use cooling tower water instead of refrigeration $22,644 - $22,644
628,992
kWh
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $18,425 $8,602 $13,541
376,135
kWh
$4,884
-
kW-mo/yr
- - - -
10 2.3134: Shift from daytime to nighttime operation $10,853 - - $10,853
-
kW-mo/yr
- - - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,719 $23,924 $9,719
269,976
kWh
- - - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $9,249 $4,614 $4,984
138,432
kWh
$1,798
-
kW-mo/yr
- - $2,467 -
13 3.4151: Minimize water usage $5,548 $5,000 - - - $5,548
-
Tgal
- -
14 2.2625: Chill water to the highest temperature possible $4,896 - $3,598
99,960
kWh
$1,298
-
kW-mo/yr
- - - -
15 2.2511: Insulate bare equipment $3,086 $2,700 $2,268
63,000
kWh
$818
-
kW-mo/yr
- - - -
16 3.4116: Meter recycled water (to reduce sewer charges) $2,970 $2,000 - - - $2,970
-
Tgal
- -
17 2.7142: Utilize higher efficiency lamps and/or ballasts $2,776 $2,533 $1,850
51,378
kWh
$667
-
kW-mo/yr
- - - $259
TOTAL RECOMMENDED $264,930 $228,473 $132,449
3,676,953
kWh
$46,955
-
kW-mo/yr
$78,142 $8,518
-
Tgal
$(-893.0) $(-241.0)
TOTAL IMPLEMENTED $46,300 $18,749 $34,860
968,105
kWh
$12,574
-
kW-mo/yr
- - $(-893.0) $(-241.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs