ITAC Assessment: NC0516
ITAC logo
ITAC Assessment: NC0516
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Injection molded plastic parts
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 44,341
ft2
Annual Production 157,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,480 2,740,035
kWh
Electricity Demand $59,318 5,453
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,076 $24,656 $8,438
200,421
kWh
$3,638
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,207 $1,497 $579
13,754
kWh
$628
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $218 $75 $145
3,456
kWh
$63
-
kW-mo/yr
- $10
04 2.7142: Utilize higher efficiency lamps and/or ballasts $272 $80 $90
2,138
kWh
$32
-
kW-mo/yr
- $150
05 2.7135: Install occupancy sensors $587 $1,594 $587
13,934
kWh
- - -
06 2.2612: Use cooling tower water instead of refrigeration $1,840 $8,000 $1,430
33,961
kWh
$410
-
kW-mo/yr
- -
07 2.7241: Install outside air damper / economizer on hvac unit $2,479 $5,500 $2,479
58,881
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $798 $50 $558
13,248
kWh
$240
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $467 $50 $452
10,742
kWh
$195
-
kW-mo/yr
$(-100.0) $(-80.0)
TOTAL RECOMMENDED $19,944 $41,502 $14,758
350,535
kWh
$5,206
-
kW-mo/yr
$(-100.0) $80
TOTAL IMPLEMENTED $18,104 $33,502 $13,328
316,574
kWh
$4,796
-
kW-mo/yr
$(-100.0) $80
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings