Assessment Year | 2007 |
---|---|
Principal Product | Lightweight Specialty Paper |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
274,000
ft2
|
Annual Production | 20,645,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,911,956 | 15,817,528 |
kWh
|
$0.12 |
Natural Gas | $2,404,550 | 194,128 |
MMBtu
|
$12.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $185,527 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $102,512 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $10,167 | - |
$10,166
84,016
kWh
|
$1
-
kW-mo/yr
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,378 | - |
$7,377
60,965
kWh
|
$1
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,268 | - |
$5,267
43,529
kWh
|
$1
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,715 | $2,349 |
$19,714
162,926
kWh
|
$1
-
kW-mo/yr
|
- | - | |
05 | 2.2135: Repair and eliminate steam leaks | $6,121 | $66 | - | - | - |
$6,121
-
MMBtu
|
|
06 | 2.2136: Install / repair insulation on steam lines | $2,143 | $542 | - | - | - |
$2,143
-
MMBtu
|
|
07 | 2.2136: Install / repair insulation on steam lines | $545 | $185 | - | - | - |
$545
-
MMBtu
|
|
08 | 2.2442: Preheat combustion air with waste heat | $67,711 | $37,811 | - | - | - |
$67,711
-
MMBtu
|
|
09 | 2.2414: Use waste heat from hot flue gases to preheat | $46,500 | $34,295 | - | - | - |
$46,500
-
MMBtu
|
|
10 | 2.6211: Conserve energy by efficient use of vending machines | $311 | $543 |
$311
2,573
kWh
|
- | - | - | |
11 | 2.3212: Optimize plant power factor | $15,304 | $45,129 | - | - | $15,304 | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,364 | $16,006 |
$4,363
36,067
kWh
|
$1
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $185,527 | $136,926 |
$47,198
390,076
kWh
|
$5
-
kW-mo/yr
|
$15,304 |
$123,020
-
MMBtu
|
||
TOTAL IMPLEMENTED | $102,512 | $53,986 |
$47,198
390,076
kWh
|
$5
-
kW-mo/yr
|
- |
$55,309
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs