ITAC Assessment: SU0253
ITAC logo
ITAC Assessment: SU0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Lightweight Specialty Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 274,000
ft2
Annual Production 20,645,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,911,956 15,817,528
kWh
Natural Gas $2,404,550 194,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $185,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4314: Use synthetic lubricant $10,167 - $10,166
84,016
kWh
$1
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,378 - $7,377
60,965
kWh
$1
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,268 - $5,267
43,529
kWh
$1
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,715 $2,349 $19,714
162,926
kWh
$1
-
kW-mo/yr
- -
05 2.2135: Repair and eliminate steam leaks $6,121 $66 - - - $6,121
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $2,143 $542 - - - $2,143
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $545 $185 - - - $545
-
MMBtu
08 2.2442: Preheat combustion air with waste heat $67,711 $37,811 - - - $67,711
-
MMBtu
09 2.2414: Use waste heat from hot flue gases to preheat $46,500 $34,295 - - - $46,500
-
MMBtu
10 2.6211: Conserve energy by efficient use of vending machines $311 $543 $311
2,573
kWh
- - -
11 2.3212: Optimize plant power factor $15,304 $45,129 - - $15,304 -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $4,364 $16,006 $4,363
36,067
kWh
$1
-
kW-mo/yr
- -
TOTAL RECOMMENDED $185,527 $136,926 $47,198
390,076
kWh
$5
-
kW-mo/yr
$15,304 $123,020
-
MMBtu
TOTAL IMPLEMENTED $102,512 $53,986 $47,198
390,076
kWh
$5
-
kW-mo/yr
- $55,309
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs