ITAC Assessment: HO0008
ITAC logo
ITAC Assessment: HO0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BRASS FITTINGS
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,794
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $396,872 3,208,089
kWh
Natural Gas $24,465 4,275
MMBtu
Fuel Oil #2 $40,000 7,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $244,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $244,257

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $631 $1,032 $694
5,569
kWh
- - $(-63.0)
02 2.4133: Use most efficient type of electric motors $2,973 $742 $2,973
24,033
kWh
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,555 - $6,920
55,979
kWh
$(-1,365.0)
-
MMBtu
- -
04 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $235,098 - $237,285
1,917,937
kWh
- $40,000
-
MMBtu
$(-42,187.0)
TOTAL RECOMMENDED $244,257 $1,774 $247,872
2,003,518
kWh
$(-1,365.0)
-
MMBtu
$40,000
-
MMBtu
$(-42,250.0)
TOTAL IMPLEMENTED $244,257 $1,774 $247,872
2,003,518
kWh
$(-1,365.0)
-
MMBtu
$40,000
-
MMBtu
$(-42,250.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs