64
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0150 #01 Y:2019 | 01 | 2019 | Recover heat from exhausted steam, hot air or hot water | $20,467 | $29,138 | |
| UU0152 #08 Y:2019 | 08 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,208 | $231 | |
| UU0152 #07 Y:2019 | 07 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $1,480 | $3,445 | |
| UU0152 #06 Y:2019 | 06 | 2019 | Use / purchase optimum sized compressor | $1,817 | $3,415 | |
| UU0152 #05 Y:2019 | 05 | 2019 | Shift from daytime to nighttime operation | $2,562 | $4,000 | |
| UU0152 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $9,593 | $32,661 | |
| UU0152 #03 Y:2019 | 03 | 2019 | Apply for tax-free status for energy purchases | $10,938 | $2,000 | |
| UU0152 #02 Y:2019 | 02 | 2019 | Recover and reuse waste material | $12,915 | $9,000 | |
| UU0152 #01 Y:2019 | 01 | 2019 | Use cooling tower water instead of refrigeration | $33,354 | $66,174 | |
| UU0144 #04 Y:2018 | 04 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,420 | $128 | |
| UU0144 #03 Y:2018 | 03 | 2018 | Optimize plant power factor | $6,190 | $6,000 | |
| UU0144 #02 Y:2018 | 02 | 2018 | Apply for tax-free status for energy purchases | $16,349 | $400 | |
| UU0144 #01 Y:2018 | 01 | 2018 | Insulate bare equipment | $42,296 | $1,068 | |
| UU0122 #07 Y:2017 | 07 | 2017 | Reduce the pressure of compressed air to the minimum required | $2,745 | - | |
| UU0122 #06 Y:2017 | 06 | 2017 | Insulate bare equipment | $5,324 | $11,240 | |
| UU0122 #05 Y:2017 | 05 | 2017 | Install occupancy sensors | $6,799 | $4,244 | |
| UU0122 #04 Y:2017 | 04 | 2017 | Upgrade controls on compressors | $7,349 | $800 | |
| UU0122 #03 Y:2017 | 03 | 2017 | Use waste heat from flue gases to heat space conditioning air | $15,162 | $26,440 | |
| UU0122 #02 Y:2017 | 02 | 2017 | Apply for tax-free status for energy purchases | $55,559 | $500 | |
| UU0122 #01 Y:2017 | 01 | 2017 | Reschedule plant operations or reduce load to avoid peaks | $204,798 | - |