Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Food Grade Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 155
Plant Area 110,000
ft2
Annual Production 2,100,000
units
Production Hrs. Annual 8,520
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,313 7,266,173
kWh
Electricity Demand $229,209 14,544
kW-mo/yr
Electricity Fees $42,246 -
Natural Gas $11,528 1,368
MMBtu
TOTAL YEARLY COSTS $560,296
RECOMMENDED SAVINGS* $80,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,726

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $20,467 $29,138 $10,936
286,272
kWh
$9,531
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,018 $6,202 $13,018
340,800
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,551 $23,008 $7,938
207,803
kWh
$4,613
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $7,605 $15,000 $6,381
167,041
kWh
$1,224
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $5,756 $21,565 $3,640
95,300
kWh
$2,115
-
kW-mo/yr
-
06 2.3212: Optimize plant power factor $5,042 $5,250 - - $5,042
07 2.6218: Turn off equipment when not in use $3,861 - $3,861
100,414
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,762 $3,762 $3,762
98,469
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,385 $3,385 $3,385
88,622
kWh
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,768 $1,756 $1,639
42,902
kWh
$129
-
kW-mo/yr
-
11 2.8121: Apply for tax-free status for energy purchases $1,570 $1,000 - - $1,570
12 2.6218: Turn off equipment when not in use $1,157 $950 $703
18,403
kWh
$454
-
kW-mo/yr
-
13 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $921 $1,440 $858
22,542
kWh
$63
-
kW-mo/yr
-
TOTAL RECOMMENDED $80,863 $112,456 $56,121
1,468,568
kWh
$18,129
-
kW-mo/yr
$6,612
TOTAL IMPLEMENTED $45,726 $43,346 $29,454
770,388
kWh
$9,660
-
kW-mo/yr
$6,612
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs