ITAC Assessment: UU0152
ITAC logo
ITAC Assessment: UU0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Molded Plastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 61,900
ft2
Annual Production 6,100
ton
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,171 3,812,639
kWh
Electricity Demand $107,676 6,632
kW-mo/yr
Electricity Fees $63,345 -
Natural Gas $3,853 507
MMBtu
Waste Disposal Costs
Water Usage $10,470 2,084
Tgal
TOTAL YEARLY COSTS $324,515
RECOMMENDED SAVINGS* $73,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,471

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings
01 2.2612: Use cooling tower water instead of refrigeration $33,354 $66,174 $20,507
561,817
kWh
$12,847
-
kW-mo/yr
- -
02 3.5311: Recover and reuse waste material $12,915 $9,000 - - - $12,915
03 2.8121: Apply for tax-free status for energy purchases $10,938 $2,000 - - $10,938 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,593 $32,661 $5,977
163,737
kWh
$3,616
-
kW-mo/yr
- -
05 2.3134: Shift from daytime to nighttime operation $2,562 $4,000 - $2,562
-
kW-mo/yr
- -
06 2.4226: Use / purchase optimum sized compressor $1,817 $3,415 $811
22,220
kWh
$1,005
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,480 $3,445 $785
21,514
kWh
$695
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,208 $231 $749
20,519
kWh
$459
-
kW-mo/yr
- -
TOTAL RECOMMENDED $73,867 $120,926 $28,830
789,807
kWh
$21,184
-
kW-mo/yr
$10,938 $12,915
TOTAL IMPLEMENTED $36,471 $47,307 $7,537
206,476
kWh
$5,080
-
kW-mo/yr
$10,938 $12,915
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs