ITAC Assessment: ME0301
ITAC logo
ITAC Assessment: ME0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Textiles
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 185,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $415,813 5,752,052
kWh
Electricity Demand $115,252 12,626
kW-mo/yr
Electricity Fees $17,069 -
LPG $108,781 13,694
MMBtu
Fuel Oil #6 $144,146 37,868
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,391 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $27,427 $27,427 $11,059
152,989
kWh
$21,693
-
kW-mo/yr
$(-5,325.0)
-
MMBtu
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,375 $13,500 $20,221
212,192
kWh
- $(-7,846.0)
-
MMBtu
- -
03 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $11,743 $35,073 - - $11,743
-
MMBtu
- -
04 2.4239: Eliminate or reduce compressed air usage $5,346 $7,200 $5,346
55,979
kWh
- - - -
05 3.5311: Recover and reuse waste material $7,500 $3,600 - - - $7,500
-
lb
-
06 4.131: Modify process to reduce material use/cost $5,000 $15,000 - - - - $5,000
TOTAL RECOMMENDED $69,391 $101,800 $36,626
421,160
kWh
$21,693
-
kW-mo/yr
$(-1,428.0)
-
MMBtu
$7,500
-
lb
$5,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs